RHINO HEADERS
SAVINGS CALCULATOR

ENTER YOUR MATERIAL AND LABOR COSTS

User the National Average Costs listed in each category OR simply adjust them to the Actual Costs in your region, using the TAB key.

Sawn Lumber:
$/LF
$/LF
$/LF
%
Engineered Wood:
$/LF
(Assume no waste due to pre-cut lengths)

 

Rigid Insulation:
$/LF

 

Labor Cost:
$/hour
$/hour
%
$
(Average cost per incident)
Exterior Windows and Doors:
Size
Windows
Doors
Totals
30-36
13
40-46
8
50-56
3
60-66
2
80-86
1
100
0
Totals
32
3
27
30-36
40-46
50-56
60-66
80-86
100
Totals
Windows
32
Doors
3
Totals
13
8
3
2
1
0
27